Restoration of national grid ongoing — TCN

Post Date : November 5, 2024

The Transmission Company of Nigeria has stated that the national grid experienced a partial disturbance at about 1;52 pm on Tuesday.

This followed a series of lines and generators trippings that caused instability of the grid and, consequently, the partial disturbance of the system. The data from the National Control Centre (NCC) revealed that a part of the grid was not affected by the bulk power disruption.

In a statement by Ndidi Mbah, the GM of Public Affairs, TCN engineers are already working to quickly restore bulk power supply to the states affected by the partial disturbance. Presently, bulk power supply has been restored to Abuja, at 2.49pm, and we are gradually restoring to other parts of the country.

TCN apologized for every inconvenience this may cause Nigerians.

Leave a Reply

Your email address will not be published. Required fields are marked *